صفحه اصلی
ایمیل
نقشه سایت
21/10/2018

At the beginning, the center was built on an area of 10 hectares with an infrastructure of 17,000 square meters. Sections included emergency, internal, surgical, clinic, laboratory, radiology, CCU, operating room and related departments. From 1996 to 2007, the Center for Children, Infants, Endoscopy, MRI, ICU, Pathology, Dialysis, Specific Diseases, CT scan, Diabetes Clinic, Emergency Triage, Bronchoscopy, Physiotherapy and Angiography were added to this center.

From 2007 to today, the hospital's infrastructure increased to 35,000 square meters. Cardiac surgery room and heart ICU in 2008, VIP section in 2009 and NICU in 2012 was launched. The sections of dialysis and special diseases were developed and emergency trauma and admission in 2011 Separated.

Pregnant and high-risk pregnant women with 13 beds in 2013 and an oncology section with 5 beds in 2014 were launched. Also, since May 15, 2014, with the commencement of the Health System Development Plan, in addition to the repair and construction of the ICU2 section, the domestic women's sector was substantially refurbished. In addition, in line with the plan, the patient's contribution to paying for hospitalization has decreased by 3 to 6 percent.

 


  Voting Visitor statistics  
subject

yes
no

 

 

 Visitors of page : 26
 Visitors of day : 19
 Visitors sum : 1131
 Online visitors : 1
 Page load : 0.7031

 

 

 

 

Rafsanjan,imam Ali Bolvard

Designed & Developed by:IT unit

Copyright © 2011 www.rums.ac.ir - All rights reserved